![](https://www.es-processing.com/wp-content/uploads/2024/02/6_Alexandria_cement_plant.jpg)
19 Sep Alexandria (Egypt) – 2018: Migration of the DCS from CEMAT V7.1 to CEMAT V8.2
Posted at 06:18h
in news
ES Processing carried out the migration of the entire DCS by implementing 12 PLCs S7 416-3 that communicate with two new Redundant Servers, an Engineering Station, ten Operator Stations.