Beni Suef Line 1 (Egypt) – 2018: Migration of the DCS from CEMAT V7.0 to CEMAT V8

ES Processing carried out the migration of the entire DCS by implementing 12 PLCs S7 416-3 that communicate with two new Redundant Servers, an Engineering Station, twelve Operator Stations.