18 Jul Omexom Vinci Energies France – Al Safwa Cement Plant, KSA (2015): Automation in PCS7/WinCC
Posted at 08:45h
in news
This project consisted of the study, design, engineering and commissioning of the DCS (Siemens PCS7/WinCC) ensuring the control of the high voltage substation (110kV) of the Al-Safwa cement plant.
The main functionalities of the DCS are the following:
- Data acquisition (short-term and long-term archiving, curves and trend controls, messages/Alarms processing),
- Full control of the entire installation and equipment from the control room,
- Diagnostics and troubleshooting functionalities…