![](https://www.es-processing.com/wp-content/uploads/2024/02/8_North_Macedonia_Usje_cement_plant_1.jpg)
19 May Usje (Macedonia) – 2018: Migration of the DCS from STEP7/WINCC and OMRON/IN TOUCH to CEMAT V8.2
Posted at 06:22h
in news
ES Processing carried out the migration of the entire DCS by implementing 9 PLCs S7 416-3/410 that communicate with two new Redundant Servers, an Engineering Station, eight Operator Stations.