ES PROCESSING performed the study, design, engineering and commissioning of the entire system including Automation PLC/HMI, Emergency tripping system, Interlock/Intertrip system, Calculation sheets… The project consisted of designing, engineering and commissioning of the automation system of the traction power substations of Constantine Transit System. The Constantine...

ES PROCESSING performed the study, design, engineering and commissioning of the entire system including Automation PLC/HMI, Emergency tripping system, Interlock/Intertrip system, Calculation sheet… The project consisted of designing, engineering and commissioning of the ‘traction power substations’ automation system. Reims line has 7 traction power substations (including...

ES PROCESSING carried out the study, design and engineering of the entire system including Automation PLC/HMI, Emergency tripping system, Interlock/Intertrip system, Calculation sheet… The project consisted of engineering and designing the Automation system for the “traction & lighting power substations” to ensure control of all of...

ES PROCESSING realized the study, design, engineering and commissioning of the entire system which includes Automation PLC/HMI, Emergency tripping system, Interlock/Intertrip system, Calculation sheet… The project consisted of revamping and extending the automation system for the “traction power substations”, including : 25 substations equipped with GE...

This revamping project involved data acquisition, control of the Hydraulic valves and dampers, Calculation and PID control of DAM levels and flow, short-term and long-term archiving, curves and trend controls, message/Alarm processing, calculation and regulation, diagnostics and automated report generation....